The Cassadaga Wind Project is a 125.5 MW wind farm located in the Towns of Charlotte and Cherry Creek in Chautauqua County, NY. The project will be located primarily on agricultural and recreational land and will include 37 turbines (126-megawatts) when completed. The project’s point of interconnection is National Grid’s 115kV lines 161 and 162 near the existing Moon Road substation in the Town of Stockton. Once built, the project will generate sufficient clean energy to power over 51,000 homes.